Block Party Ale
Smooth amber extract ale with caramel malt depth and a gentle Willamette hop finish.

drink
Batch size: 5 gallons
Ingredients
- Specialty Grain
- ½ lbCaramel 80L
- ⅛ lbSpecial B
- ⅛ lbLight Roasted Barley
- Extracts & Other Fermentables
- 6 lbGold malt syrup
- Premium Hops & Other Flavorings
- 1 ozWillamette (60 min)
- Yeast
- Dry Yeast: Muntons Ale Yeast (Optimum temp: 57°–77°F)
- Priming Sugar
- 5 ozPriming Sugar (for bottling day)
Instructions
- *Before You Begin*
- Ensure you have:
- Homebrewing starter kit for 5-gallon batches
- Boiling kettle of ≥3.5 gallons capacity
- ~2 cases of 12 oz or 22 oz pry-off style beer bottles
- Refrigerate yeast upon arrival.
- Verify kit inventory matches the listed ingredients.
- Contact Northern Brewer with questions.
- *On Brewing Day*
- Collect and heat 2.5 gallons of water.
- If using crushed grains (e.g., for extract kits), steep crushed grain in a mesh bag in water at 170°F for 20 minutes; remove and discard.
- Bring to a boil and add 6 lbs Gold malt syrup; stir until dissolved.
- Return wort to boil; this mixture is now called "wort".
- Add 1 oz Willamette hops; boil for 60 minutes.
- Cool wort rapidly to ~100°F (use wort chiller or ice bath).
- Sanitize fermenting equipment, yeast pack, lid/stopper, lock, funnel, and scissors.
- Fill primary fermenter with 2 gallons cold water, then pour cooled wort in. Leave thick sludge at bottom.
- Add more cold water as needed to reach 5 gallons total volume.
- Aerate the wort thoroughly (shake, splash, or use aeration system/diffusion stone).
- When wort temperature ≤78°F, sanitize scissors, cut yeast pack corner, and pitch yeast into fermenter.
- Seal fermenter; add ~1 tbsp water to airlock, insert, and seal.
- Move fermenter to warm, dark, quiet spot until fermentation begins.
- *Beyond Brewing Day (Weeks 1–2)*
- Active fermentation begins ~48 hours after brewing; foam cap forms, bubbles visible in airlock.
- Active fermentation ends ~1–2 weeks later: foam recedes, bubbling slows/stops.
- *Bottling Day (~2 Weeks After Brewing Day)**
- Sanitize siphoning and bottling equipment.
- Prepare priming solution: dissolve 5 oz priming sugar in 16 oz water; boil 1–2 min; cool.
- Siphon beer into bottling bucket; gently mix with priming solution (do not splash).
- Fill and cap bottles.
- *2 Weeks After Bottling Day*
- Condition bottles at room temperature for 2 weeks.
- After conditioning, store bottles cool or cold. Serve by pouring into clean glass, leaving sediment behind. Cheers!